Kuosheng 1
Kuosheng, Wang-Li, Taipei,
Taiwan
Boiling Water Reactor (BWR)
Net Output: 948 MWe
Operable. Initial criticality:
02/1981. Commercial start: 12/1981.
Utility:
Taiwan Power Co.
Reactor Supplier:
General Electric Co.
Steam Generator Supplier:
Westinghouse Electric Corp.
Architecture:
Bechtel Corp.
Construction:
Taiwan Power Co. |
Kuosheng 2
Kuosheng, Wang-Li, Taipei,
Taiwan
Boiling Water Reactor (BWR)
Net Output: 948 MWe
Operable. Initial criticality:
03/1982. Commercial start: 03/1983.
Utility:
Taiwan Power Co.
Reactor Supplier:
General Electric Co.
Steam Generator Supplier:
Westinghouse Electric Corp.
Architecture:
Bechtel Corp.
Construction:
Taiwan Power Co. |