Shimane 1
Kashima-cho, Shimane, Japan
Boiling Water Reactor (BWR)
Net Output: 439 MWe
Operable. Initial criticality:
06/1973. Commercial start: 03/1974.
Utility:
Chugoku
Electric Power Co., Inc.
Reactor Supplier:
Hitachi
Steam Generator Supplier:
Hitachi
Architecture:
Hitachi
Construction:
Kajima |
Shimane 2
Kashima-cho, Shimane, Japan
Boiling Water Reactor (BWR)
Net Output: 790 MWe
Operable. Initial criticality:
05/1988. Commercial start: 02/1989.
Utility:
Chugoku
Electric Power Co., Inc.
Reactor Supplier:
Hitachi
Steam Generator Supplier:
Hitachi
Architecture:
Hitachi
Kajima
Construction:
Kajima
Okumura
Shimizu |