Nuclear Reactor Maps: Shimane



Shimane 1
Kashima-cho, Shimane, Japan
Boiling Water Reactor (BWR)
Net Output: 439 MWe
Operable. Initial criticality: 06/1973. Commercial start: 03/1974.

Utility:
     Chugoku Electric Power Co., Inc. 
Reactor Supplier:
     Hitachi 
Steam Generator Supplier:
     Hitachi 
Architecture:
     Hitachi 
Construction:
     Kajima

Shimane 2
Kashima-cho, Shimane, Japan
Boiling Water Reactor (BWR)
Net Output: 790 MWe
Operable. Initial criticality: 05/1988. Commercial start: 02/1989.

Utility:
     Chugoku Electric Power Co., Inc. 
Reactor Supplier:
     Hitachi 
Steam Generator Supplier:
     Hitachi 
Architecture:
     Hitachi
     Kajima 
Construction:
     Kajima
     Okumura
     Shimizu

Facility Photo

.
Shimane Prefecture
Institute of Environmental Science - Radiation Monitoring

Shimane Power Plant